Exhibition Dosenfabrik Stresemannstrasse 374, Hamburg

(top)
Almut Linde
Dirty Minimal #11.1 White Cube
Building materials, white paint, lights, 380 x 1000 x 520 cm, 1993

An exhibition room was build in the factory space of an old cannery. Inside is the white cube, outside the dirt of the abandoned factory.



(center)
Manuel Ludeña
3 Prefabricated Elements From a Building Crane
Building crane elements, 3 parts each 105 x 105 x 600 cm, 1993

Three preassembled parts of a crane were placed in a line such that they overlap.



(bottom)
Santiago Sierra
3 Asphalt Rectangles, 1993

This work could not be realized due to the impossibility of a later removal of the work.